A sequential inspection and preventive replacement policy for heterogeneous components

Vol 56, 2024 - 309949
Complete Articles (CA)
Favorite this paper
How to cite this paper?
Abstract

In this study, some rigid assumptions of models that establish inspections at constant intervals (periodic or non-sequential) are relaxed. A new hybrid policy of sequential inspections and preventive replacement is proposed. The proposed model, based on the delay-time concept and calculated using the renewal theory with rewards, is designed for a single-component system, where the components come from a heterogeneous population (weak and strong). The model is also extended to consider imperfect inspections (false positives and negatives), addressing the misclassification of defects, a common issue in practice. The proposed policy is compared with two other classic policies from the literature: a hybrid policy of non-sequential inspections and preventive replacement, and a pure inspection policy. The long-term cost rate per unit of time is calculated, and the numerical results demonstrate savings of up to 6.4%, especially when the costs in the defective state are high.

Share your ideas or questions with the authors!

Did you know that the greatest stimulus in scientific and cultural development is curiosity? Leave your questions or suggestions to the author!

Sign in to interact

Have a question or suggestion? Share your feedback with the authors!

Institutions
  • 1 Universidade Federal de Pernambuco (UFPE)
  • 2 UFPE - Universidade Federal de Pernambuco
Track
  • 16. POI – OR in Industry
Keywords
Maintenance Policies
Sequential Inspections
Delay-time