This paper was published through Galoá and has a deposited DOI. To cite this paper, use one of the standards below:
In case you are one of the co-authors and want to register this paper in your Lattes, use the following code: doi > 10.59254/sbpo-2024-193410
If you've NEVER registered a DOI in your Lattes, check our tutorial!We address the practical industrial problem known in the literature as job sequencing and tool switching problem, whose objective is to determine a job processing order that minimizes the total number of setup operations. To address this NP-hard problem, we present an implementation of the iterated local search meta-heuristic. Considering all instances available in the literature, the proposed method is compared to the current state-of-the-art method for the problem solution. The experiments carried out demonstrate that the quality of the reported solutions is equivalent to the best-known results. However, the proposed method substantially outperforms the current state of the art when considering the execution time required to obtain the solutions. Given the practical nature of the problem, faster methods are preferable for use in industries aiming at production planning. Additionally, new better results are presented for some instances widely used in the literature.
With nearly 200,000 papers published, Galoá empowers scholars to share and discover cutting-edge research through our streamlined and accessible academic publishing platform.
Learn more about our products:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Attention: this is not a DOI for the paper and as such cannot be used in Lattes to identify a particular work.
Check the link "How to cite" in the paper's page, to see how to properly cite the paper