If you've NEVER registered a DOI in your Lattes, check our tutorial!Stockyards are essential components of the mining logistics chain. In general, reclaimers are used in these stockyards to reclaim the ore from the stockpiles, transferring it to conveyor belts to take it to other locations. The scheduling of stockpile reclaim operations in ore stockyards is a scheduling problem on unrelated parallel machines, with setup times dependent on the sequence, due date, and machine eligibility. This study proposes a mixed-integer linear programming formulation to minimize the total tardiness. The formulation was implemented in the Gurobi solver and tested on small instances generated from operational data from the Port of Tubarão. The results showed that the solver was able to find the optimal solution for instances with up to 10 jobs and four reclaimers.
With nearly 200,000 papers published, Galoá empowers scholars to share and discover cutting-edge research through our streamlined and accessible academic publishing platform.
Learn more about our products:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Attention: this is not a DOI for the paper and as such cannot be used in Lattes to identify a particular work.
Check the link "How to cite" in the paper's page, to see how to properly cite the paper