This paper was published through Galoá and has a deposited DOI. To cite this paper, use one of the standards below:
In case you are one of the co-authors and want to register this paper in your Lattes, use the following code: doi > 10.59254/sbpo-2024-193813
If you've NEVER registered a DOI in your Lattes, check our tutorial!This study addresses a variant of the Assembly Line Worker Assignment and Balancing Problem (ALWABP) for the job rotation planning, named JRALWABP. The objective is to maximize the number of distinct tasks assigned to workers during periods while respecting task precedence and an average cycle time limit. An adaptation of an ALWABP model to JRALWABP (model M2) is presented, and compared with the most recent JRALWABP model from the literature (model M1). Model M1 outperformed model M2 for small-scale instances, while both models had similar performances with larger cycle time increments (tolerances of 25% and 50%). The order strength of the precedence graph influenced the number of nodes visited by the solver. The difficulty in finding feasible solutions suggests that hybrid techniques could be beneficial for solving this problem.
With nearly 200,000 papers published, Galoá empowers scholars to share and discover cutting-edge research through our streamlined and accessible academic publishing platform.
Learn more about our products:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Attention: this is not a DOI for the paper and as such cannot be used in Lattes to identify a particular work.
Check the link "How to cite" in the paper's page, to see how to properly cite the paper