This paper was published through Galoá and has a deposited DOI. To cite this paper, use one of the standards below:
In case you are one of the co-authors and want to register this paper in your Lattes, use the following code: doi > 10.59254/sbpo-2024-193488
If you've NEVER registered a DOI in your Lattes, check our tutorial!In the production process of industries, there are stages that must be prioritized in production planning. The present work aims to propose resolution strategies for the scheduling problem in the heat treatment stage of a steel industry. It is a single-machine problem with sequence-dependent setup times. The application of the Variable Neighborhood Search (VNS) algorithm, along with the development of a Variance Analysis Heuristic (HAV), resulted in significant improvements in minimizing the schedule completion date compared to traditional methods used by the production analyst. The strategies proved to be effective in all tested instances, generating sufficiently good solutions in reduced time. The results highlight the efficiency and practical usefulness of Operational Research techniques in this type of problem.
With nearly 200,000 papers published, Galoá empowers scholars to share and discover cutting-edge research through our streamlined and accessible academic publishing platform.
Learn more about our products:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Attention: this is not a DOI for the paper and as such cannot be used in Lattes to identify a particular work.
Check the link "How to cite" in the paper's page, to see how to properly cite the paper