This paper was published through Galoá and has a deposited DOI. To cite this paper, use one of the standards below:
In case you are one of the co-authors and want to register this paper in your Lattes, use the following code: doi > 10.59254/sbpo-2025-212682
If you've NEVER registered a DOI in your Lattes, check our tutorial!One of the bottlenecks for the energy transition of the automotive industry is the autonomy of electric vehicle batteries. Contributions to rationalize the battery production process can mean time and resource savings, allowing the industry's focus to be concentrated on improving energy storage technology. In this sense, this paper applies to Mixed Integer Linear Programming to model and solve the Sequencing Problem in Resource-Constrained Designs (PSPRR) of the production of batteries for electric automobiles. Two production scenarios were analyzed and compared, considering precedent relationships between activities and resource limitations. The result demonstrates the importance of the PSPRR for production planning, allowing the industry to anticipate challenges and test different scenarios for optimized production.
With nearly 200,000 papers published, Galoá empowers scholars to share and discover cutting-edge research through our streamlined and accessible academic publishing platform.
Learn more about our products:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Attention: this is not a DOI for the paper and as such cannot be used in Lattes to identify a particular work.
Check the link "How to cite" in the paper's page, to see how to properly cite the paper