Predictive Solution to Aid Decision Making in Tension Control Maneuvers by ONS Real-Time Operators

- 326334
Complete Articles (CA)
Favorite this paper
How to cite this paper?
Abstract

Decision-making in Real-Time (RT) operations at the Brazil's National Electric System Operator (ONS) is becoming increasingly complex due to grid expansion and the growing participation of intermittent energy sources. Although Operational Instructions (OIs) provide comprehensive guidelines, they cannot predict all possible scenarios. This paper presents the development of a predictive computational tool with an interface designed to meet operator demands, aimed at assisting in voltage control, one of the critical daily actions in the operation of the National Interconnected System (SIN). The proposed predictive voltage control solution applies techniques for high-performance Human-Machine Interface (HMI) and the Goal Directed Task Analysis (GDTA) method to identify user requirements. Test results with ONS operators demonstrate the tool's effectiveness.

Share your ideas or questions with the authors!

Did you know that the greatest stimulus in scientific and cultural development is curiosity? Leave your questions or suggestions to the author!

Sign in to interact

Have a question or suggestion? Share your feedback with the authors!

Institutions
  • 1 Operador Nacional do Sistema Elétrico (ONS)
  • 2 Universidade Federal Fluminense (UFF)
Track
  • 7. EN&OG – OR in Energy, Oil and Gas
Keywords
Voltage Control
Predictive Tool
Decision Making