This paper was published through Galoá and has a deposited DOI. To cite this paper, use one of the standards below:
In case you are one of the co-authors and want to register this paper in your Lattes, use the following code: doi > 10.59254/sbpo-2025-212458
If you've NEVER registered a DOI in your Lattes, check our tutorial!In industrial settings, production planning and machine downtime for maintenance are key factors in the search for more robust, reliable, and economically viable processes, as they reduce unexpected failures, which lead to costly production interruptions for the industry. Mathematical models based on periodic maintenance problems can support operational decisions in which equipment must operate continuously, but preventive maintenance shutdowns must be scheduled. In this sense, balancing maintenance costs and reliability is essential to provide a system for which maintenance should be planned carefully to avoid penalties related to machine shortage. Thus, this study presents a multi-objective mathematical model that minimizes maintenance and penalty costs associated with production interruption due to machine shortage over a 52-week time horizon. Results indicated effective solutions by reducing maintenance costs while eliminating penalties. Therefore, the proposed model is a promising tool to support decisions in planning the periodic maintenance for equipment in continuous service.
With nearly 200,000 papers published, Galoá empowers scholars to share and discover cutting-edge research through our streamlined and accessible academic publishing platform.
Learn more about our products:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Attention: this is not a DOI for the paper and as such cannot be used in Lattes to identify a particular work.
Check the link "How to cite" in the paper's page, to see how to properly cite the paper