FORMULATIONS FOR THE JOB SEQUENCING PROBLEM WITH SEQUENCE-DEPENDENT SETUPS AND INVENTORY CONSTRAINTS

- 326268
Complete Articles (CA)
Favorite this paper
How to cite this paper?
Abstract

This work addresses the problem of minimizing makespan in single-machine job scheduling, considering release dates, sequence-dependent setup times, and inventory constraints. Four distinct mathematical formulations were proposed to represent the problem: the first based on position-indexed variables; the second on arc-indexed variables; the third on arcs combined with inventory levels; and the fourth on arc-time indexes. To evaluate the performance of each model, experiments were conducted on a set of 450 generated instances. The results indicate that the arc-indexed formulation showed the best overall performance, being the only one capable of solving instances with up to 50 tasks and achieving the optimal solution in 154

Share your ideas or questions with the authors!

Did you know that the greatest stimulus in scientific and cultural development is curiosity? Leave your questions or suggestions to the author!

Sign in to interact

Have a question or suggestion? Share your feedback with the authors!

Institutions
  • 1 Universidade Federal da Paraíba
  • 2 UFPB
Track
  • 16. OD-Discrete Optimization
Keywords
Scheduling
Inventory
Integer linear programming