This paper was published through Galoá and has a deposited DOI. To cite this paper, use one of the standards below:
In case you are one of the co-authors and want to register this paper in your Lattes, use the following code: doi > 10.59254/sbpo-2025-212411
If you've NEVER registered a DOI in your Lattes, check our tutorial!The transition to electric vehicles (EVs) is central to reducing carbon emissions. This article proposes a cost-benefit analysis, integrated with georeferencing, for the expansion of General Motors' (GM) electric charging infrastructure in Pernambuco. The methodology has four stages, market data collection, demography and public policies, georeferenced analysis with heat maps and clustering (DBSCAN), demand projection and scenario simulation with Python and @RISK and cost-benefit calculation. The results indicate that the EV fleet in Pernambuco will reach 1,100 vehicles by 2025, requiring investments between R$ 6.2 million and R$ 8.8 million in infrastructure and benefits such as a reduction of 2,200 tons of CO2/year and an increase in EV sales. The analysis is aligned with local public policies, IPVA exemption with the 'Green Corridor' program and ESG criteria. It is concluded that the investment is feasible, recommending public-private partnerships and integration of renewable energies.
With nearly 200,000 papers published, Galoá empowers scholars to share and discover cutting-edge research through our streamlined and accessible academic publishing platform.
Learn more about our products:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Attention: this is not a DOI for the paper and as such cannot be used in Lattes to identify a particular work.
Check the link "How to cite" in the paper's page, to see how to properly cite the paper