Para citar este trabalho use um dos padrões abaixo:
This study presents an integrated approach combining linear programming and Monte Carlo simulation to quantify the impact of disposal infrastructure uncertainty on long-term mining production. By incorporating probabilistic representations of infrastructure availability and operational constraints, the methodology provides a more realistic assessment of production risks compared to traditional deterministic planning.
The results indicate a total impact of 66.67 Mt of ROM, mainly concentrated in the short term, with critical periods reaching failure probabilities of up to 100%. This corresponds to an estimated financial impact between US$ 2.7 billion and US$ 4.4 billion, evidencing the economic relevance of such uncertainties.
The findings demonstrate that neglecting disposal constraints can significantly overestimate production capacity and project value, reinforcing the importance of probabilistic and constraint-aware approaches in mining planning.
Com ~200 mil publicações revisadas por pesquisadores do mundo todo, o Galoá impulsiona cientistas na descoberta de pesquisas de ponta por meio de nossa plataforma indexada.
Confira nossos produtos e como podemos ajudá-lo a dar mais alcance para sua pesquisa:
Esse proceedings é identificado por um DOI , para usar em citações ou referências bibliográficas. Atenção: este não é um DOI para o jornal e, como tal, não pode ser usado em Lattes para identificar um trabalho específico.
Verifique o link "Como citar" na página do trabalho, para ver como citar corretamente o artigo