To cite this paper use one of the standards below:
This study presents an integrated approach combining linear programming and Monte Carlo simulation to quantify the impact of disposal infrastructure uncertainty on long-term mining production. By incorporating probabilistic representations of infrastructure availability and operational constraints, the methodology provides a more realistic assessment of production risks compared to traditional deterministic planning.
The results indicate a total impact of 66.67 Mt of ROM, mainly concentrated in the short term, with critical periods reaching failure probabilities of up to 100%. This corresponds to an estimated financial impact between US$ 2.7 billion and US$ 4.4 billion, evidencing the economic relevance of such uncertainties.
The findings demonstrate that neglecting disposal constraints can significantly overestimate production capacity and project value, reinforcing the importance of probabilistic and constraint-aware approaches in mining planning.
With nearly 200,000 papers published, Galoá empowers scholars to share and discover cutting-edge research through our streamlined and accessible academic publishing platform.
Learn more about our products:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Attention: this is not a DOI for the paper and as such cannot be used in Lattes to identify a particular work.
Check the link "How to cite" in the paper's page, to see how to properly cite the paper