This paper was published through Galoá and has a deposited DOI. To cite this paper, use one of the standards below:
In case you are one of the co-authors and want to register this paper in your Lattes, use the following code: doi > 10.59254/sbpo-2025-212415
If you've NEVER registered a DOI in your Lattes, check our tutorial!This paper addresses the flexible job shop scheduling problem (FJS) with the minimiza-
tion of total flow time. A novel mixed-integer linear programming (MILP) model is presented using
the time-indexed formulation strategy. To improve the results of large instances, a branch-and-cut
(B&C) algorithm is developed, integrating a proposed valid inequality and a constructive heuris-
tic based on the shortest processing time rule to generate upper bounds for this algorithm. The
experimental results show that the B&C algorithm achieves more feasible solutions (66.67%) and
lower mean optimality gap (37.47%) compared to the time-indexed model, especially for larger
instances. The study also presents the performance profiles of the methods. Contributions of this
research include the new time-indexed formulation, algorithmic enhancement via valid inequalities,
and publicly available benchmark data for future research.
With nearly 200,000 papers published, Galoá empowers scholars to share and discover cutting-edge research through our streamlined and accessible academic publishing platform.
Learn more about our products:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Attention: this is not a DOI for the paper and as such cannot be used in Lattes to identify a particular work.
Check the link "How to cite" in the paper's page, to see how to properly cite the paper