To cite this paper use one of the standards below:
Offshore oil and gas production in Brazil, particularly from the Pre-Salt reservoirs, presents substantial operational challenges driven by the high energy intensity of Floating Production Storage and Offloading (FPSO) units. Designed to maximize the efficiency and reliability of Gas-to-Wire (GTW) conversion, power hubs transform natural gas into electricity using clean and high-performance generation technologies. This paper proposes a mixed-integer linear programming (MILP) model to optimize the integration of power hubs into an offshore network as a synergistic solution to generate energy from natural gas, effectively mitigating the operational load on FPSO units and enhancing the economic viability of E&P projects. The results show that the suggested model represents a valuable opportunity to support decision making during the conceptual design phase, ensuring efficient and resource-optimized operations.
With nearly 200,000 papers published, Galoá empowers scholars to share and discover cutting-edge research through our streamlined and accessible academic publishing platform.
Learn more about our products:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Attention: this is not a DOI for the paper and as such cannot be used in Lattes to identify a particular work.
Check the link "How to cite" in the paper's page, to see how to properly cite the paper