This paper was published through Galoá and has a deposited DOI. To cite this paper, use one of the standards below:
In case you are one of the co-authors and want to register this paper in your Lattes, use the following code: doi > 10.59254/sbpo-2024-193833
If you've NEVER registered a DOI in your Lattes, check our tutorial!Outsourcing is a commonly used business tactic to increase production capacity without the need for additional investments in manufacturing facilities. Typically, decision makers use outsourcing to manage temporary spikes in demand or to improve specific performance metrics (such as delivery times) quickly and without making modifications to the manufacturing site. This study focuses on minimizing the total system makespan in a 2-stage flowshop setting where initial operation can be outsourced. The problem is formulated using Mixed Integer Linear Programming (MILP) and a heuristic based on the branch and check strategy is proposed. Although traditional MILP approaches are computationally intensive for various scheduling problems, the proposed branch and check approach presents interesting results in surpassing existing benchmarks in the literature and emerges as a practical strategy for real-world applications.
Con casi 200.000 artículos publicados, Galoá permite a los académicos compartir y descubrir investigaciones de vanguardia a través de nuestra plataforma de publicación académica optimizada y accesible.
Obtenga más información sobre nuestros productos:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Atención: este no es un DOI para el trabajo y, como tal, no se puede usar en Lattes para identificar un trabajo en particular.
Check the link "How to cite" en la página del papel, para ver cómo citar correctamente el papel