To cite this paper use one of the standards below:
This study addresses the unrelated parallel machine scheduling problem with resource constraints, an NP-hard problem with broad practical application across various industrial sectors. To solve this problem, we propose two methods structured in a two-stage architecture: a heuristic approach using the Iterated Local Search (ILS) metaheuristic hybridized with a greedy heuristic, and a matheuristic combining the ILS metaheuristic with a constraint programming model. We compare our results with those obtained by an exact model and a metaheuristic from the literature. Both approaches outperform the reference metaheuristic and compete effectively with the exact method in generating optimal solutions. Additionally, the heuristic method's low computational time highlights it as an efficient alternative for real-world scenarios with larger instances, enabling rapid decision-making and adjustments in production scheduling.
With nearly 200,000 papers published, Galoá empowers scholars to share and discover cutting-edge research through our streamlined and accessible academic publishing platform.
Learn more about our products:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Attention: this is not a DOI for the paper and as such cannot be used in Lattes to identify a particular work.
Check the link "How to cite" in the paper's page, to see how to properly cite the paper