To cite this paper use one of the standards below:
The present study proposes a Mixed Integer Linear Programming model for tactical production planning in a make-to-stock industrial plant with capacity constraints and safety stocks. The problem is motivated by a real case of a manufacturer of hydronic solutions, involving 151 SKUs planned over 12 months. Two types of production structures are considered: simple circuits, in which products are processed in a single cell, and complex circuits, which involve alternative routes, sequential steps, and shared resources. The results show significant reductions in inventory levels and safety stock violations in relation to the current planning.
With nearly 200,000 papers published, Galoá empowers scholars to share and discover cutting-edge research through our streamlined and accessible academic publishing platform.
Learn more about our products:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Attention: this is not a DOI for the paper and as such cannot be used in Lattes to identify a particular work.
Check the link "How to cite" in the paper's page, to see how to properly cite the paper