This paper proposes a conditional priority heuristic for order sequencing in a 3D Farm composed of FDM printers. The problem is modeled as a production scheduling problem on heterogeneous parallel machines, considering practical operational factors such as due dates, paid priority, printer efficiency, failure rate, production capacity, and setup times associated with filament changes, understood as the combination of material and color. The proposed heuristic starts from an initial FIFO queue and allows priority orders to overtake regular orders only when this movement does not violate the latest printing start time or the due date of the affected orders. After the queue is reorganized, orders are allocated to feasible printers by considering expected delay, setup requirements, and operational risk. The approach was evaluated through computational scenarios generated from real G-code files sliced in PrusaSlicer, including different order volumes and workload conditions. The proposed method was compared with FIFO and absolute-priority strategies. The results indicate that the conditional-priority heuristic preserves due dates while still benefiting priority orders, reduces setup times and filament changes, and avoids the delays imposed on regular orders by an unrestricted priority policy. These findings suggest that the proposed approach can provide a practical balance between commercial priority, delivery reliability, and operational efficiency in on-demand 3D printing farms.
With nearly 200,000 papers published, Galoá empowers scholars to share and discover cutting-edge research through our streamlined and accessible academic publishing platform.
Learn more about our products:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Attention: this is not a DOI for the paper and as such cannot be used in Lattes to identify a particular work.
Check the link "How to cite" in the paper's page, to see how to properly cite the paper