NSGA-II-based Multi-Objective Optimization for a Flexible Flow Shop No-Wait Problem with Unrelated Parallel Machines

Vol 57, 2025 - 340873
Complete Articles (CA)
Favorite this paper
How to cite this paper?
Abstract

Scheduling production in environments with multiple stages, heterogeneous machines, and specific operational constraints directly impacts production efficiency. In food industries, sequencing and allocation decisions also influence the use of raw materials. This paper investigates a Flexible Flow Shop Scheduling problem with unrelated parallel machines in a dairy industry, considering sequence-dependent setups and no-wait constraints. A multiobjective approach based on the Non Dominated Sorting Genetic Algorithm II (NSGA-II) is proposed, aiming to maximize the accumulated raw material yield and minimize the total processing time. The method was evaluated in eight real instances. The results indicate the generation of promising non-mastered solutions with low computational time, offering relevant alternatives for production planning.

Share your ideas or questions with the authors!

Did you know that the greatest stimulus in scientific and cultural development is curiosity? Leave your questions or suggestions to the author!

Sign in to interact

Have a question or suggestion? Share your feedback with the authors!

Institutions
  • 1 Universidade Federal de Campina Grande
  • 2 Universidade Federal da Paraíba
Track
  • POI – OR in Industry
Keywords
Flow shop scheduling
Multi-objective optimization
NSGA-II