Favorite this paper
How to cite this paper?
Abstract

Short-term operation of cascaded run-of-river hydropower plants is a challenging optimization problem: plants are hydraulically coupled, turbine efficiency curves are non-linear, and feasible schedules must respect reservoir levels, turbine flows, ramping rates, and unit commitment. We propose GIVP, a hybrid metaheuristic combining GRASP, ILS, VND, and Path Relinking to produce daily generation schedules. GRASP builds diverse initial solutions; ILS and VND refine them through structured neighborhood moves and perturbations; Path Relinking intensifies the search between elite solutions. The objective function penalizes constraint violations while maximizing generated power. Evaluated on real operational data from a three-plant cascade with seven generating units in southern Brazil, GIVP achieves the lowest objective-function cost in 8 of 14 test scenarios after Optuna hyperparameter tuning, outperforming Differential Evolution, PSO, and Unified PSO in solution quality at the cost of higher execution time. Results confirm hybrid local-search frameworks as a competitive approach for hydropower scheduling.

Share your ideas or questions with the authors!

Did you know that the greatest stimulus in scientific and cultural development is curiosity? Leave your questions or suggestions to the author!

Sign in to interact

Have a question or suggestion? Share your feedback with the authors!

Institutions
  • 1 Universidade Federal Fluminense
  • 2 Radix Engenharia e Desenvolvimento de Software
  • 3 Companhia Energética Rio das Antas - CERAN
  • 4 Companhia Paulista de Força e Luz - CPFL
Track
  • MH – Metaheurístics
Keywords
Optimization
Metaheuristic
Hydroelectric Generation
Local Search