This paper was published through Galoá and has a deposited DOI. To cite this paper, use one of the standards below:
In case you are one of the co-authors and want to register this paper in your Lattes, use the following code: doi > 10.59254/sbpo-2026-232439
If you've NEVER registered a DOI in your Lattes, check our tutorial!In the oil industry, the discovery of new hydrocarbon accumulations requires selecting exploratory projects and scheduling drilling rigs to execute them. Project selection and rig scheduling are usually handled separately, which may lead to portfolios that are infeasible from an operational perspective. This paper integrates project selection, scheduling, and rig routing in the Drilling Rig Scheduling Problem with Budget Constraints. We present two mixed-integer linear programming formulations and a GRASP-based metaheuristic with RVND local search. Computational results show that exact methods are suitable for small instances, but their performance deteriorates for larger cases. In such instances, the proposed heuristic finds high-quality solutions in short computational times, outperforming CPLEX in all large instances evaluated.
Views per month
Galoá count, excluding known robots. Updated on 30/09/2026.
Views per month
Galoá count, excluding known robots. Updated on 30/09/2026.
With nearly 200,000 papers published, Galoá empowers scholars to share and discover cutting-edge research through our streamlined and accessible academic publishing platform.
Learn more about our products:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Attention: this is not a DOI for the paper and as such cannot be used in Lattes to identify a particular work.
Check the link "How to cite" in the paper's page, to see how to properly cite the paper