A Multiobjective Approach to the Problem of Task Sequencing and Tool Changing on Non-Identical Parallel Machines

Vol 57, 2025 - 340620
Scientific Initiation Prize
Favorite this paper
How to cite this paper?
Abstract

Flexible Manufacturing Systems often operate with tool holders of limited capacity, which requires tool changes between consecutive tasks. In environments with non-identical parallel machines, capacity differences, machine-dependent processing times, and changeover times make sequencing decisions strongly interdependent. Previous studies on this formulation of the problem address in isolation objectives such as tool changes (TS), makespan (Cmax) and total flow time (TFT). This work investigates a multiobjective approach based on Iterated Local Search, called MO-ILS, simultaneously considering the objectives (TS, Cmax). Computational experiments were carried out to compare the proposed methodology with an exact technique.

Share your ideas or questions with the authors!

Did you know that the greatest stimulus in scientific and cultural development is curiosity? Leave your questions or suggestions to the author!

Sign in to interact

Have a question or suggestion? Share your feedback with the authors!

Institutions
  • 1 UFMG - Universidade Federal de Minas Gerais
  • 2 Universidade Federal de Minas Gerais
Track
  • AD&GP – Operations Research in Production Management and Administration
Keywords
Scaling Parallel Machines
Tool change
Multi-objective optimization.