This paper was published through Galoá and has a deposited DOI. To cite this paper, use one of the standards below:
In case you are one of the co-authors and want to register this paper in your Lattes, use the following code: doi > 10.59254/sbpo-2026-232756
If you've NEVER registered a DOI in your Lattes, check our tutorial!Scheduling production in environments with multiple stages, heterogeneous machines, and specific operational constraints directly impacts production efficiency. In food industries, sequencing and allocation decisions also influence the use of raw materials. This paper investigates a Flexible Flow Shop Scheduling problem with unrelated parallel machines in a dairy industry, considering sequence-dependent setups and no-wait constraints. A multiobjective approach based on the Non Dominated Sorting Genetic Algorithm II (NSGA-II) is proposed, aiming to maximize the accumulated raw material yield and minimize the total processing time. The method was evaluated in eight real instances. The results indicate the generation of promising non-mastered solutions with low computational time, offering relevant alternatives for production planning.
Views per month
Galoá count, excluding known robots. Updated on 22/11/2026.
Views per month
Galoá count, excluding known robots. Updated on 22/11/2026.
With nearly 200,000 papers published, Galoá empowers scholars to share and discover cutting-edge research through our streamlined and accessible academic publishing platform.
Learn more about our products:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Attention: this is not a DOI for the paper and as such cannot be used in Lattes to identify a particular work.
Check the link "How to cite" in the paper's page, to see how to properly cite the paper