This paper was published through Galoá and has a deposited DOI. To cite this paper, use one of the standards below:
In case you are one of the co-authors and want to register this paper in your Lattes, use the following code: doi > 10.59254/sbpo-2026-232567
If you've NEVER registered a DOI in your Lattes, check our tutorial!Sequencing problems are fundamental in production systems subject to machine deterioration over time. This work proposes a new bi-objective problem of sequencing in parallel unrelated machines, considering sequence-dependent deterioration and the integration of maintenance operations that restore the performance of the machines. The goal is to simultaneously minimize makespan and total task delay. For this, a model of Multiobjective Mixed Integer Nonlinear Programming is formulated. In addition, a new set of instances is generated. For small instances, an enumeration-based method is used to obtain optimal solutions, allowing model validation. The perceptions show that the integration between sequencing and maintenance can improve the performance of the production system, highlighting the relevance of the proposed approach.
Views per month
Galoá count, excluding known robots. Updated on 22/11/2026.
Views per month
Galoá count, excluding known robots. Updated on 22/11/2026.
With nearly 200,000 papers published, Galoá empowers scholars to share and discover cutting-edge research through our streamlined and accessible academic publishing platform.
Learn more about our products:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Attention: this is not a DOI for the paper and as such cannot be used in Lattes to identify a particular work.
Check the link "How to cite" in the paper's page, to see how to properly cite the paper