If you've NEVER registered a DOI in your Lattes, check our tutorial!Public transportation is essential to the lives of citizens, since when it is well planned, it guarantees the efficiency of the system, the right to come and go and less spending. This article analyzes the functioning of the BRT - Bus Rapid Transit modal, in Teresina-PI, from its implementation project (2016) and after the COVID-19 pandemic period (2019). For this work, bibliographical research and on-site surveys were carried out. The conclusion is that the system is unsatisfactory, as its implementation was not completed and the service was not offered in Teresina during the pandemic, generating criticism and a collapse in urban mobility, as more private vehicles began to circulate on the roads. It should also be noted that the feeder lines from the same area and from adjacent areas have no direct connection, and are concentrated at central stops in the historic center of Teresina.
With nearly 200,000 papers published, Galoá empowers scholars to share and discover cutting-edge research through our streamlined and accessible academic publishing platform.
Learn more about our products:
This proceedings is identified by a DOI , for use in citations or bibliographic references. Attention: this is not a DOI for the paper and as such cannot be used in Lattes to identify a particular work.
Check the link "How to cite" in the paper's page, to see how to properly cite the paper