HEURISTIC FOR THE M-MACHINE NO-WAIT FLOW SHOP SCHEDULING PROBLEM WITH HIERARCHICAL OBJECTIVE

Vol 51, 2019 - 108887
Prêmio de IC
Favoritar este trabalho
Como citar esse trabalho?
Resumo

This paper addresses the m-machine no-wait flow shop scheduling problem. Two hierarchical objective functions are considered: (1) minimizing makespan subject to the constraint that mean completion time is less than or equal to a given value; and (2) minimizing total completion time subject to the constraint that makespan is less than or equal to a given value. For each objective, an Iterated Greedy with Local Search (IGLS) algorithm is proposed. Computational experiments were performed to evaluate the performance of IGLS against other heuristics in the literature. The results show that the IGLS outperform the other methods in both effectiveness and efficiency.

Compartilhe suas ideias ou dúvidas com os autores!

Sabia que o maior estímulo no desenvolvimento científico e cultural é a curiosidade? Deixe seus questionamentos ou sugestões para o autor!

Faça login para interagir

Tem uma dúvida ou sugestão? Compartilhe seu feedback com os autores!

Instituições
  • 1 Departamento de Engenharia de Produção / Escola de Engenharia de São Carlos / Universidade de São Paulo
  • 2 Escola de Engenharia de São Carlos / Universidade de São Paulo
Eixo Temático
  • AD&GP – PO na Administração e Gestão da Produção
Palavras-chave
No-wait flowshop
Makespan
Mean completion time